Skip to content
Datum
18-storey office tower on the Lagos waterfront
← All projects

Commercial · Lagos, Nigeria

Floors
18
Floor area
24,600 m²
Result
2 weeks early
Sector
Commercial
Year
2024
Client
Harbourline Group

[Story]

An 18-floor office tower on a tight Marina plot, handed over two weeks ahead of the signed programme.

01

The brief

Harbourline wanted lettable floors before the next dry season. The plot had one access road and a neighbour on three sides. We fixed the price and the crane programme before the first pile.

02

The line

We set the datum at the top of pile caps and reported every Friday against it: concrete poured, steel delivered, floors closed in. Slab cycles ran at seven days from level 4 onward.

03

Handover

Handed over 14 days early, with a snag list of 11 items, all cleared inside the week. Named lead: the site director on the signed handover certificate.

Completed glass office tower beside a river
Bare concrete office shell with floor-to-ceiling windows, ready for fit-out
Reinforced concrete frame rising floor by floor
Elevated road deck and rail crossing on a completed section

[Promised vs delivered]

MeasurePromisedDelivered
Programme30 months29.5 months
Budget₦38.0bn₦37.6bn
Scale24,600 m²24,600 m²
Next projectKubwa Link Road
[CH 0+000][CH 0+500][CH 1+000]