[01] Commercial
Offices, warehouses and industrial buildings, priced against your drawings and programmed back from your move-in date. Services are coordinated before the slab is poured, not after.
Typical post-tensioned span
Largest single hub
Slab cycle from level 4
[02] Residential
Apartments, estates and townhouses built to a signed sample unit. Every home is checked against that sample before the buyer walks it.
Ikoyi Courtyard, zero snags
Party wall, 2-hr rated
Defects care after handover
[03] Civil
Roads, bridges, culverts and drainage. We plan around rain days and community access, and report progress in chainage so you can walk it.
Kubwa Link Road
Box culvert section
Longest bridge span
[04] Fit-out
Renovation and fit-out of occupied buildings, one floor at a time. Noisy work runs at night; each floor has a hard handback date.
Four floors, tenants in place
Raised-floor void
Acoustic partition rating
[Contract models]
| Row | Design & build | General contracting | Construction management |
|---|---|---|---|
| You bring | A brief and a plot | Complete drawings | Drawings and your trade preferences |
| We handle | Design, price, build, handover | Pricing, programme, build | Trade tenders, site management, reporting |
| Best for | Owners who want one contract | Owners with a design team | Owners who want control of each trade |
[Process]
Five stages, one line.
- 02Fixed price in 10 working days
- 03Mobilise
- 04Build & weekly report
- 05Handover & 12-month care
Brief & site visit
We walk the plot with you, check access, ground and neighbours, and write down what you want built and by when.
01
Brief & site visit
We walk the plot with you, check access, ground and neighbours, and write down what you want built and by when.
02
Fixed price in 10 working days
A priced bill of quantities, a programme and the name of every package owner. Provisional sums are listed and capped.
03
Mobilise
We set out the site, fix the datum and sign the reference: cost, programme, quality. Both sides sign before the first pile.
04
Build & weekly report
Every Friday you get a one-page report against the line: progress, cost, incidents, changes on paper.
05
Handover & 12-month care
Snags closed, as-builts filed, keys handed over. We return for defects for twelve months.
[FAQ]
Yes. We run offices in Abuja and Accra and have built in other states and in Ghana. For remote sites we mobilise a site team and a named project lead before the price is fixed.
We price what is drawn, list what is not, and cap each provisional sum in writing. Our pre-construction lead can also close gaps with your designer before you commit.
Nothing changes by word of mouth. Each change gets a one-page variation with cost and days, signed by you, before work starts.
One page: progress against programme, cost against the agreed price, incidents, open variations and the next two weeks. You can read it in five minutes.
Send us what you have. A pre-construction lead will tell you which contract model fits and what it would take to price it.




