Four sectors, three contract models, one fixed line for cost, time and quality.

Steel roof trusses of a commercial building

[01] Commercial

Offices, warehouses and industrial buildings, priced against your drawings and programmed back from your move-in date. Services are coordinated before the slab is poured, not after.

Typical post-tensioned span

Largest single hub

Slab cycle from level 4

Apartment blocks with landscaped frontage

[02] Residential

Apartments, estates and townhouses built to a signed sample unit. Every home is checked against that sample before the buyer walks it.

Ikoyi Courtyard, zero snags

Party wall, 2-hr rated

Defects care after handover

Elevated roadway and bridge piers under construction between cranes

[03] Civil

Roads, bridges, culverts and drainage. We plan around rain days and community access, and report progress in chainage so you can walk it.

Kubwa Link Road

Box culvert section

Longest bridge span

Interior being renovated, scaffold and bare walls

[04] Fit-out

Renovation and fit-out of occupied buildings, one floor at a time. Noisy work runs at night; each floor has a hard handback date.

Four floors, tenants in place

Raised-floor void

Acoustic partition rating

[Contract models]

RowDesign & buildGeneral contractingConstruction management
You bringA brief and a plotComplete drawingsDrawings and your trade preferences
We handleDesign, price, build, handoverPricing, programme, buildTrade tenders, site management, reporting
Best forOwners who want one contractOwners with a design teamOwners who want control of each trade

[Process]

Five stages, one line.

  1. 01Brief & site visit
  2. 02Fixed price in 10 working days
  3. 03Mobilise
  4. 04Build & weekly report
  5. 05Handover & 12-month care

Brief & site visit

We walk the plot with you, check access, ground and neighbours, and write down what you want built and by when.

  1. 01

    Brief & site visit

    We walk the plot with you, check access, ground and neighbours, and write down what you want built and by when.

  2. 02

    Fixed price in 10 working days

    A priced bill of quantities, a programme and the name of every package owner. Provisional sums are listed and capped.

  3. 03

    Mobilise

    We set out the site, fix the datum and sign the reference: cost, programme, quality. Both sides sign before the first pile.

  4. 04

    Build & weekly report

    Every Friday you get a one-page report against the line: progress, cost, incidents, changes on paper.

  5. 05

    Handover & 12-month care

    Snags closed, as-builts filed, keys handed over. We return for defects for twelve months.

[FAQ]

  • Yes. We run offices in Abuja and Accra and have built in other states and in Ghana. For remote sites we mobilise a site team and a named project lead before the price is fixed.

  • We price what is drawn, list what is not, and cap each provisional sum in writing. Our pre-construction lead can also close gaps with your designer before you commit.

  • Nothing changes by word of mouth. Each change gets a one-page variation with cost and days, signed by you, before work starts.

  • One page: progress against programme, cost against the agreed price, incidents, open variations and the next two weeks. You can read it in five minutes.

[CH 0+000][CH 0+500][CH 1+000]

Send us what you have. A pre-construction lead will tell you which contract model fits and what it would take to price it.