Skip to content
Datum

[About]

Datum was founded in Lagos in 2009 by two site engineers tired of watching projects drift past budget. Seventeen years and 214 handovers later, the rule hasn't changed.

[Timeline]

Seventeen years, measured from one line.

  1. 2009

    Founded

    First warehouse in Apapa.

  2. 2013

    First high-rise

  3. 2017

    Abuja office + civil division

  4. 2021

    Accra office + fit-out team

  5. 2025

    200th handover

[Values]

  • [01]

    Say the number.

    Price, days, tonnes, millimetres. If it can be measured, we put it in the report.

  • [02]

    Own the site.

    Every package has a named person on it. When something slips, you know who to call.

  • [03]

    Leave it level.

    Handover means the snag list is closed, the as-builts are filed and the site is clean.

[Leadership]

  • Portrait of Folake Bamgbose, Managing Director (stand-in photo)

    Folake Bamgbose

    Managing Director

    Call about: the signed reference, cost, time and quality.

  • Portrait of Chidi Nwosu, Director of Construction (stand-in photo)

    Chidi Nwosu

    Director, Construction

    Call about: the programme, the site and the weekly report.

  • Portrait of Amara Eze, Director of Pre-construction (stand-in photo)

    Amara Eze

    Director, Pre-construction

    Call about: fixed prices, buildability and your drawings.

  • Portrait of Zainab Bello, Head of Safety (stand-in photo)

    Zainab Bello

    Head of Safety

    Call about: site rules, incidents and the 3.1M-hour record.

Workers in hi-vis gathered on site for a safety briefing

[Safety]

3.1M

site hours since our last lost-time incident

  • ISO 9001
  • ISO 14001
  • ISO 45001
[CH 0+000][CH 0+500][CH 1+000]