Civil · Abuja, Nigeria

Length
11.4 km
Bridges
3
Result
On programme
Sector
Civil
Year
2023
Client
FCT Works Agency

[Story]

11.4 km of dual carriageway with three bridges, built through two rainy seasons without a missed milestone.

01

The brief

A road that floods is a road that fails. Drainage was priced and programmed first, before the first lift of asphalt.

02

The line

Chainage was our datum. Every Friday the report showed km of subbase, base and wearing course against the plan, with rain days logged.

03

Handover

Opened on the agreed date. Budget moved by 1.6% on a signed change for extra culverts at CH 6+200.

Completed glass office tower beside a river
Bare concrete office shell with floor-to-ceiling windows, ready for fit-out
Reinforced concrete frame rising floor by floor
Elevated road deck and rail crossing on a completed section

[Promised vs delivered]

MeasurePromisedDelivered
Programme22 months22 months
Budget₦24.5bn₦24.9bn
Scale11.4 km11.4 km
Next projectIkoyi Courtyard Residences
[CH 0+000][CH 0+500][CH 1+000]