- Floor area
- 42,000 m²
- Docks
- 24
- Status
- On site
- Sector
- Commercial
- Year
- 2025
- Client
- Meridian Logistics
[Story]
A 42,000 m² steel-framed hub with 24 loading docks, roof steel now going on.
01
The brief
Meridian needs the racking installed before peak season. The programme works backwards from that date.
02
The line
Floor flatness is the datum here: FF50 slab tolerance checked bay by bay and reported weekly.
03
Status
Roof steel is going on. Next report: purlin completion by bay.
[Promised vs delivered]
| Measure | Promised | Delivered |
|---|---|---|
| Programme | 14 months | On track |
| Budget | ₦17.2bn | On budget |
| Scale | 42,000 m² | 42,000 m² |
[CH 0+000][CH 0+500][CH 1+000]