Skip to content
Datum
Warehouse with white cladding and loading area
← All projects

Commercial · Lagos, Nigeria

Floor area
42,000 m²
Docks
24
Status
On site
Sector
Commercial
Year
2025
Client
Meridian Logistics

[Story]

A 42,000 m² steel-framed hub with 24 loading docks, roof steel now going on.

01

The brief

Meridian needs the racking installed before peak season. The programme works backwards from that date.

02

The line

Floor flatness is the datum here: FF50 slab tolerance checked bay by bay and reported weekly.

03

Status

Roof steel is going on. Next report: purlin completion by bay.

Completed glass office tower beside a river
Bare concrete office shell with floor-to-ceiling windows, ready for fit-out
Reinforced concrete frame rising floor by floor
Elevated road deck and rail crossing on a completed section

[Promised vs delivered]

MeasurePromisedDelivered
Programme14 monthsOn track
Budget₦17.2bnOn budget
Scale42,000 m²42,000 m²
Next projectCantonments Office Floors
[CH 0+000][CH 0+500][CH 1+000]